Project Description

Listowel Racecourse Co. Kerry

In 2018 James Healy undertook a comprehensive study of the tracks at Listowel Racecourse. This study included Analysis of Soils and Sub Soils, Existing Drainage and Grass Status. A detailed survey was undertaken to determine the existing levels on the tracks. A full and detailed report was submitted to the Listowel Racecourse Directors. Works began in 2019 involving Phase No.1. of the project including Sward Renewal and the installation of a Skeletal Drainage System.